© afors 2024. All rights reserved.
Script Executed in 49.00 miliSeconds
this is the top panel
For Sale my vans Rv7 empennage Kit
Return to education has disturbed my building plans
Inlcuded
Horizontal Stabiliser 95% finished (rear spar not installed for inspection)
Vertical Stabiliser 95% finished (spar not installed for inspection purposes)
Rudder 70% finished
Elevator not touched (includes electric trim tab)
Im also selling a huge selection of tools, pneumatic air riveter, bucking bars, aviation drill bits, clecos and cleco pliers, counter sinking tools, deburring tools etc..
All tools are new and purchased recently
All work carried out by myself aircraft mechanic and studying mechanical engineer